Cambridge 7 Test 2 Reading Passage 3: Makete Integrated Rural Transport Project

tejaswini.webp

Author

16-09-2025

makete-integrated-rural-transport-project-rural-transport-project.webp

Makete Integrated Rural Transport Project Reading Answers with explanations are given here for your reference and understanding. This practice test is from Cambridge 7 test 2 reading passage 3. The reading passage has six paragraphs along with 14 questions. The questions are divided into four categories: matching headings questions, yes no not given questions, sentence completion questions, and multiple choice questions.

Table of contents:

Solution for Makete Integrated Rural Transport Project

Answer Table

27. ii 31. No 35. Not Given 39. E
28. v 32. Yes 36. D 40. B
29. x 33. No 37. I  
30. i 34. Yes 38. G  

Check out our YouTube Channel to Practice Full-Length IELTS Reading Tests Daily

IELTS Reading Practice Test Demo

Makete Integrated Rural Transport Project

We have provided a Makete Integrated Rural Transport Project Reading reading passage. Read carefully and answer all the questions(27-40). 

Reading Passage 3

Section A

The disappointing results of many conventional road transport projects in Africa led some experts to rethink the strategy by which rural transport problems were to be tackled at the beginning of the 1980s. A request for help in improving the availability of transport within the remote Makete District of southwestern Tanzania presented the opportunity to try a new approach.

The concept of 'integrated rural transport' was adopted in the task of examining the transport needs of rural households in the district. The objective was to reduce the time and effort needed to obtain access to essential goods and services through an improved rural transport system. The underlying assumption was that the time saved would be used instead for activities that would improve the social and economic development of the communities. The Makete Integrated Rural Transport Project (MIRTP) started in 1985 with financial support from the Swiss Development Corporation and was coordinated with the help of the Tanzanian government.

Section B

When the project began, Makete District was virtually totally isolated during the rainy season. The regional road was in such bad shape that access to the main towns was impossible for about three months of the year Road traffic was extremely rare within the district, and alternative means of transport were restricted to donkeys in the north of the district. People relied primarily on the paths, which were slippery and dangerous during the rains.

Before solutions could be proposed, the problems had to be understood. Little was known about the transport demands of rural households, so Phase I, between December 1985 and December 1987, focused on research. The socio-economic survey of more than 400 households in the district indicated that a household in Makete spent, on average, seven hours a day on transporting themselves and their goods, a figure which seemed extreme but which has also been obtained in surveys in other rural areas in Africa. Interesting facts regarding transport were found: 95% was on foot; 80% was within the locality; and 70% was related to the collection of water and firewood and traveling to grinding mills. 

Section C

Having determined the main transport needs, possible solutions were identified which might reduce the time and burden. During Phase II, from January to February 1991, a number of approaches were implemented in an effort to improve mobility and access to transport.

An improvement of the road network was considered necessary to ensure the import and export of goods to the district. These improvements were carried out using methods that were heavily dependent on labour In addition to the improvement of roads, these methods provided training in the operation of a mechanical workshop and bus and truck services. However, the difference from the conventional approach was that this time consideration was given to local transport needs outside the road network.

Most goods were transported along the paths that provide shortcuts up and down the hillsides, but the paths were a real safety risk and made the journey on foot even more arduous. It made sense to improve the paths by building steps, handrails, and footbridges.

It was uncommon to find means of transport that were more efficient than walking but less technologically advanced than motor vehicles. The use of bicycles was constrained by their high cost and the lack of available spare parts. Oxen were not used at all but donkeys were used by a few households in the northern part of the district. MIRTP focused on what would be most appropriate for the inhabitants of Makete in terms of what was available, how much they could afford, and what they were willing to accept.

After careful consideration, the project chose the promotion of donkeys - a donkey costs less than a bicycle - and the introduction of a locally manufacturable wheelbarrow.

Section D

At the end of Phase II, it was clear that the selected approaches to Makete’s transport problems had had different degrees of success. Phase III, from March 1991 to March 1993, focused on the refinement and institutionalization of these activities.

The road improvements and accompanying maintenance system had helped make the district center accessible throughout the year. Essential goods from outside the district had become more readily available at the market, and prices did not fluctuate as much as they had done before.

Paths and secondary roads were improved only at the request of communities who were willing to participate in construction and maintenance. However the improved paths impressed the inhabitants, and requests for assistance greatly increased soon after only a few improvements had been completed.
The efforts to improve the efficiency of the existing transport services were not very successful because most of the motorized vehicles in the district broke down and there were no resources to repair them. Even the introduction of low-cost means of transport was difficult because of the general poverty of the district. The locally manufactured wheelbarrows were still too expensive for all but a few of the households. Modifications to the original design by local carpenters cut production time and costs. Other local carpenters have been trained in the new design so that they can respond to requests. Nevertheless, a locally produced wooden wheelbarrow which costs around 5000 Tanzanian shillings (less than US$20) in Makete, and is about one-quarter the cost of a metal wheelbarrow, is still too expensive for most people.

Donkeys, which were imported to the district, have become more common and contribute, in particular, to the transportation of crops and goods to market. Those who have bought donkeys are mainly from richer households but, with an increased supply through local breeding, donkeys should become more affordable. Meanwhile, local initiatives are promoting the renting out of the existing donkeys.

It should be noted, however, that a donkey, which at 20,000 Tanzanian shillings costs less than a bicycle, is still an investment equal to an average household's income over half a year This clearly illustrates the need for supplementary measures if one wants to assist the rural poor.

Section E

It would have been easy to criticize the MIRTP for using in the early phases a 'top-down' approach, in which decisions were made by experts and officials before being handed down to communities, but it was necessary to start the process from the level of the governmental authorities of the district. It would have been difficult to respond to the requests of villagers and other rural inhabitants without the support and understanding of district authorities.

Section F

Today, nobody in the district argues about the importance of improved paths and inexpensive means of transport. But this is the result of dedicated work over a long period, particularly from the officers in charge of community development. They played an essential role in raising awareness and interest among the rural communities.

The concept of integrated rural transport is now well established in Tanzania, where a major program of rural transport is just about to start. The experiences from Makete will help in this initiative, and Makete District will act as a reference for future work.

Questions

Questions 27-30

Reading Passage has six sections, A-F.
Choose the correct heading for sections B, C, E, and F from the list of headings below.
Write the correct number, i-xi, in boxes 27-30 on your answer sheet.

List of Headings

i.   MIRTP as a future model

ii.  Identifying the main transport problems

iii.  Preference for motorized vehicles

iv.  Government authorities’ instructions

v.  Initial improvements in mobility and transport modes

vi.  Request for improved transport in Makete

vii.  Transport improvements in the northern part of the district

viii.  Improvements in the rail network

ix.  Effects of initial MI RTP measures

x.  The cooperation of district officials

xi.  Role of wheelbarrows and donkeys

     Example            Answer
    Section A                vi

27. Section B -____

28. Section C -____

     Example            Answer
    Section D                ix

29. Section E -____

30. Section F -____

Questions 31-35

Do the following statements agree with the claims of the writer in Reading Passage?
In boxes 31-35 on your answer sheet, write

  • YES                  if the statement agrees with the claims of the writer
  • NO                    if the statement contradicts the claims of the writer
  • NOT GIVEN     if it is impossible to say what the writer thinks about this

31. MIRTP was divided into five phases.

32. Prior to the start of MIRTP the Makete district was almost inaccessible during the rainy season.

33. Phase I of MIRTP consisted of a survey of household expenditure on transport.

34. The survey concluded that one-fifth or 20% of the household transport requirement is outside the local area.

35. MIRTP hoped to improve the movement of goods from Makete district to the country’s capital.

Questions 36-39

Complete each sentence with the correct ending, A-J, below.

Write the correct letter, A-J, in boxes 36-39 on your answer sheet.

36. Construction of footbridges, steps, and handrails - ____

37. Frequent breakdowns of buses and trucks in Makete -____

38. The improvement of secondary roads and paths -____

39. The isolation of Makete for part of the year -____

  1. provided the people of Makete with experience in running bus and truck services
  2. was especially successful in the northern part of the district.
  3. differed from earlier phases in that the community became less actively involved.
  4. improved paths used for transport up and down hillsides.
  5. was no longer a problem once the roads had been improved.
  6. cost less than locally-made wheelbarrows.
  7. was done only at the request of local people who were willing to lend a hand.
  8. was at first considered by MIRTP to be affordable for the people of the district.
  9. hindered attempts to make the existing transport services more efficient.
  10. was thought to be the most important objective of Phase III.


Question 40

Choose the correct letter, A, B, C, or D.

Write the correct letter in box 40 on your answer sheet.

40. Which of the following phrases best describes the main aim of Reading Passage?

A. to suggest that projects such as MIRTP are needed in other countries

B. to describe how MIRTP was implemented and how successful it was

C. to examine how MIRTP promoted the use of donkeys

D. to warn that projects such as MIRTP are likely to have serious problems

Answers for Makete Integrated Rural Transport Project with Explanations

Makete Integrated Rural Transport Project Reading Answers with explanations are given below for your knowledge.

(Note: The text in Bold mentions the location and referring lines written in the reading passage. The lines in italics show the explanatory lines for the correct answer.)

27. Answer: ii

Explanation: 1st line in the second paragraph of section B proves that Before solutions could be proposed, the problems had to be understood. The passage states that before any solution could be developed for Makete District, the problems such as the condition of road and road traffic needed to be identified. Little was known about the transport demands and hence Phase I focused on the research.

28. Answer: v

Explanation: 2nd line of the first paragraph of section C narrates that During Phase II, from January to February 1991, a number of approaches were implemented in an effort to improve mobility and access to transport. It is mentioned in the passage that once the problems were identified, numerous approaches were implemented to improve mobility and access to transport.

29. Answer: x

Explanation: 2nd line of section E cites that It would have been difficult to respond to the requests of villagers and other rural inhabitants without the support and understanding of district authorities. The passage mentions that it wouldn’t have been easy to implement the ideas of MIRTP had the district officials not cooperated.

30. Answer: i

Explanation: The last line of the second paragraph of section F indicates that The experiences from Makete will help in this initiative, and Makete District will act as a reference for future work.  It is mentioned that Makete will act as a reference for future work for improving rural transport in Tanzania due to its proven hard work and success in improving rural transport in parts of Africa.

31. Answer: No

Explanation: 2nd line in the second paragraph of section B and 2nd line in the first paragraph of section D mentions that Little was known about the transport demands of rural households, so Phase I, between December 1985 and December 1987, focused on research. Phase III, from March 1991 to March 1993, focused on the refinement and institutionalization of these activities. The passage mentions that the MIRTP initiative was divided into three phases namely Phase I, II, and III which had their respective functions. 

32. Answer: Yes

Explanation: 1st line in the first paragraph of section B explains that When the project began, Makete District was virtually totally isolated during the rainy season. The passage mentions that when MIRTP was initiated, the Makete district was almost unreachable during the rainy season.

33. Answer: No 

Explanation: 2nd and 3rd line of the second paragraph of section B depicts that Little was known about the transport demands of the rural households, so Phase I, between December 1985 and December 1987, focused on research. The socio-economic survey of more than 400 households in the district indicated that a household in Makete spent, on average, seven hours a day on transporting themselves and their goods, a figure which seemed extreme but which has also been obtained in surveys in other rural areas in Africa. Phase I of MIRTP consisted of a survey to determine the amount of time spent on transportation by the people of Makete district. 

34. Answer: Yes 

Explanation: 4th line of the second paragraph of section B describes that Interesting facts regarding transport were found: 95% was on foot; 80% was within the locality; and 70% was related to the collection of water and firewood and traveling to grinding mills. It is mentioned in the passage that the result of the survey was that 80% percent of household transport was within the local area which means only 20% was outside.

35. Answer: Not given

Explanation: There is no information available regarding this question in the passage.

36. Answer: D

Explanation: The third paragraph of section C justifies that Most goods were transported along the paths that provide shortcuts up and down the hillsides, but the paths were a real safety risk and made the journey on foot even more arduous. It made sense to improve the paths by building steps, handrails, and footbridges. The passage mentions that the construction of footbridges, steps, and handrails improved the paths as they were used as shortcuts to transport goods but was not safe.

37. Answer: I

Explanation: 1st line of the fourth paragraph of section D notifies that The efforts to improve the efficiency of the existing transport services were not very successful because most of the motorized vehicles in the district broke down and there were no resources to repair them. The passage mentions that the efforts that were made to improve pre-existing transport services were not very prosperous as many motorized vehicles broke down and resources to repair them were not available.

38. Answer: G

Explanation: 1st line of the third paragraph of section D tells that Paths and secondary roads were improved only at the request of communities who were willing to participate in construction and maintenance. The passage mentions that the secondary roads and paths were improved only upon the request of local people who were eager to participate in the construction.

39. Answer: E

Explanation: 1st line of the second paragraph of section D represents that The road improvements and accompanying maintenance system had helped make the district center accessible throughout the year. It is mentioned that once the road was enhanced, Makete was accessible throughout the year which was earlier not possible, especially in the rainy season.

40. Answer: B

Explanation: 2nd line of the first paragraph of section C says that During Phase II, from January to February 1991, a number of approaches were implemented in an effort to improve mobility and access to transport. The whole passage talks about the initiative called MIRTP, which was started to improve the rural transport condition in the villages of Africa. It thoroughly describes MRTP’s conception, functioning, and success in the Makete district of Africa.

Also Check Solutions for

tejaswini.webp

About Author Tejaswini Kota

Tejaswini is an enthusiastic writer, reader and a passionate learner. Additionally, she was a research fellow and holds a grip in English writings and research/paper publications. She holds bachelors and masters degrees in engineering. She spent three years in the education industry and is currently working as a full-time content writer at Kanan International, writing articles for study abroad projects. She is proficient in creating good quality content that helps the students for language proficiency tests like IELTS, GRE, TOEFL etc. and can help in advising you the right choice of college for admission.

More Articles Post by Tejaswini Kota

Kanan.co is a trusted study abroad consultancy offering comprehensive services, resources, and solutions for students and education institutions. We support students at every stage of their global education journey, ensuring a smooth and guided experience. Along with test preparation for IELTS, GRE, TOEFL, and SAT, we provide expert services such as SOP writing, visa guidance, accommodation support, scholarship assistance, and education loan support. Our expertise and commitment to excellence make us a reliable partner for students pursuing international education.

 

kanan-logo1
kanan-ftr-fbkanan-ftr-igkanan-ftr-linkedinkanan-ftr-twitterkanan-ftr-youtube
kanan-ftr-phone1

+91 73555 73555

DMCA.com Protection Status
Mobile app
Mobile app

Global Headquarters

Kanan Int EdTech Inc

320 Bay Street, Suite 321 (Spaces), Toronto ON, Canada M5B 1N9

Indian Headquarters

Kanan International Pvt. Ltd.

D-wing, 2nd Floor, Trident Complex, Ellora Park Vadiwadi Road, Vadodara, Gujarat 390007

IT/ Digital Campus

Kanan International Pvt. Ltd

Old, New No 3, 2nd Floor, 1A, Dr Sadasivam Rd, T. Nagar, Chennai, Tamil Nadu 600017

Our branches

  • Bardoli
  • Bharuch
  • Chennai
  • Dehradun
  • Gurugram
  • Himatnagar
  • Karnal
  • Nadiad
  • Navsari
  • Palanpur
  • Rajkot
  • Vadodara
  • Valsad
  • Vallabh Vidyanagar
  • Vapi

Copyright © 2026 KANAN.CO All rights reserved.